The Sawgrass Wastewater Treatment consists of two aeration trains A & B and four clarification tanks per train. The Springtree Wastewater Treatment consists of four clarification tanks and an aeration tank. The tanks at both plants are connected by a steel bridge/catwalk that can be accessed from the ground. The Work generally includes Permitting and Construction. Project includes, but is not limited to, providing all labor, equipment, materials, and services to perform the repair work as shown on the drawings and specifications, and as described herein. The Project generally consists of the repair of structural concrete building components and surfaces exposed to waste water, treatment chemicals and moisture, resulting in delamination from reinforcing steel corrosion (spalling), cracking, and surface deterioration. Refer to construction documents overall scope of work. Location: Work is located in the City of Sunrise at 14150 NW 8th Street, Sunrise, FL 33325 and 4350 Springtree Drive, Sunrise, FL 33351