Specifications include, but are not limited to: The Engineering team shall gather data on the existing conditions of the parking structures through the following methods: • Site Visits • Review of existing as-built plans • Interviews with City Staff • Testing of materials as needed The Engineering team will visually inspect, survey, and report on the structural elements of the parking structures including, but not limited to, the following: • Post tensioned cast-in-place concrete slab systems • Expansion Joints • Control Joins • Columns, beams and ceilings • Waterproofing • Railings • Stairwells • Exterior Façade The Engineering team will inspect, survey and report on the facility systems of the parking structure including, but not limited to, the following: • Mechanical Systems • Electrical Systems • Plumbing Systems • Fire Protection Systems • Structural Elements The Engineering team shall analyze the data obtained from existing plans, site visits, visual inspections, and survey necessary for the development of an improvement plan