The Tennessee Department of Transportation (TDOT) will be replacing three bridge locations along S.R.14 (US-61) in the vicinity of the I-55 Interchange (Exit 7). Bridges at these locations will be replaced due to various structural deficiencies. With the bridge replacements, improvements to SR 14 and various ramps will be necessary. The project will include but is not limited to improved vertical clearance; survey; earthwork; pavement; bridge demolition; debris protection of existing telecommunication conduit; predemolition preparatory new work beneath existing bridge; bridge reconstruction (possibly staged), retaining walls, closed bridge deck drainage system and storm drainage connection; reconstruction of sidewalk; grading; erosion control; water quality; signing; ITS; lighting; striping; texture coating; seeding; traffic control; and coordination with public and private utilities.