Specifications include, but are not limited to: Full reconstruction of selected existing parking lots, installation of erosion control measures and tree protection; saw cutting of asphalt and concrete; removal and disposal of existing bituminous concrete and concrete dumpster areas; disposal of excavated material; preparing the parking lot and dumpster pad subgrade; asphalt, concrete and subgrade material testing; HMA paving; concrete dumpster pad installation; stormwater drain line jetting, cleaning and camera inspection; stormwater catch basin and manhole cleaning; installation of signage; pavement markings; protection of work; loam and seed areas; and associated site work as specified within the contract documents.