Specifications include, but are not limited to: The proposed project consists of the installation of approximately 3,100 lineal feet (LF) of new 6- in. PVC water lines, five fire hydrants, new water services, new 6-in. gate valves, street and driveway asphalt restoration in the following Maryville District streets: Poplar, Glenwood, Hill, Asbury Streets and Sassanqua Drive. The selected Contractor shall be responsible for replacing the existing water service lines with new 1-in. water service lines as noted in the engineering plans and technical specifications. All excavation, backfilling, and pavement restoration work shall comply with SCDOT construction standard specifications. Work includes but it is not limited to the following activities: 1. Submit material submittal product data sheets for engineer’s approval. 2. Attend pre-construction meeting. 3. Call 811 for underground utility mark outs prior to commencement of field activities. 4. Set up traffic controls as per SCDOT approved traffic control plan. 5. Secure work area and provide pedestrian protection. 6. Comply with all applicable OSHA safety standards. 7. Coordinate work with other utilities. 8. Sawcut asphalt. 9. Remove and dispose of existing asphalt and any unsuitable excavated soil. 10. Dewatering of excavated trench, as necessary