Specifications include, but are not limited to: The scope of work may include, but is not limited to the following: • JEPA Monthly Reporting - This activity consists of quality control review of the SMIS generated monthly reports, anomaly investigation, historical comparison analysis of the SROG wastewater system data, and adjustment of monthly cumulative reporting with documented explanation. These monthly reports tabulate and compare the projected and actual influent wastewater flow, chemical oxygen demand (COD) loading, and total dissolved solids (TSS) loading information from the SROG Metering and Sampling Stations and the 91st Avenue WWTP. The monthly data tabulation process includes the reconciliation of flume flow readings with the in-line Acoustic Doppler Flow Meters (ADFM) FloDar meters, Laser Flow meters, and recent historical data to identify and correct the values for SMIS display and for billing purposes. • Year End Flow and Loading Report (Formerly titled the Annual Data Robust Analysis) – This activity consist of developing a reconciliation analysis of the flow, COD and TSS wastewater data collected from each of the SROG Billing Metering and Sampling Stations and the 91st Avenue WWTP for each fiscal year. The database for the Year End Flow and Loading Report consists of the 7-day sampling results collected monthly over a 12-month fiscal year period. This analysis is the basis for distributing the annual operation and maintenance (O&M) costs among the SROG Partners...