Specifications include, but are not limited to: The Work generally consists of: 1. 70 SY of pavement removal and replacement for conduit boring operations – interior and exterior. 2. 840 LF of trenchless 2-way conduit for electric and communications conduits. 3. 430 LF of trenched 2-way conduit for electric and communications conduits. 4. Establishing a new primary electric feed to Concourse A and Concourse C of the existing Terminal: a. Demolition of existing electrical cable in existing conduits in and adjacent to existing terminal. b. Relay of new electrical cable in new and existing conduits in and adjacent to existing terminal. c. Three (3) separate electrical demolition and electrical installation phases required to fully establish the new electrical feed, occurring late October through mid December, 2024. 5. Installation of double swinging doors at existing louver at Concourse A. 6. Installation of communication fiber cable between Building #5 and Baggage Claim. The Engineer’s opinion of probable construction cost for the Work is between $510,000 and $600,000.