Specifications include, but are not limited to: New Perimeter Fencing: Contractor shall install the perimeter fencing and gates. The work includes the following main components. a. Perimeter Fencing – The Contractor shall install the perimeter fencing for the SCI site in accordance with the plans and specifications. b. 20-ft Rolling Gate – The Contractor shall install the 20-ft rolling gates for the SCI site in accordance with the plans and specifications. 4. Task 4 – Mobilization: The Contractor shall provide all costs for the mobilization and demobilization of all equipment, materials, and personnel to and from the site. This task also covers all work items, materials, and labor not covered in other tasks that are required to complete the scope of work. This includes all work and costs to maintain a clean Site and remove and dispose of all debris from the Site at the end of the project to the satisfaction of the Owner. Owner shall provide the primary and secondary areas for staging the Contractor’s equipment and materials for work at the Site. 5. All the trenches, piping, cleanouts, etc. shall be installed in accordance with the plans and specifications to the satisfaction of the Owner and Engineer. The Contractors shall be responsible for acquiring all the materials, labor, and equipment necessary to complete the installation of all project components per the plans, specifications, and direction of the Owner. The Contractor shall also maintain appropriate security of the trenches, piping, cleanouts, and equipment so that they are not damaged during construction. Damage to these components will be repaired or replaced at the Contractors expense