Specifications include, but are not limited to: 1 Mobilization and Demobilization (Entire Project) 1 LS * $ = $ 2 Construction Staking 1 LS * $ = $ 3 Temporary Erosion & Sediment Controls 1 LS * $ = $ 4 Gravel Removal and Salvage 1,686 SY * $ = $ 5 Chip Seal Removal and Salvage 3,245 SY * $ = $ 6 PCC Removal 68 SY * $ = $ 7 Subgrade Prep, 12" 6,228 SY * $ = $ 8 6" ACC (Surface and Base Course) 5,671 SY * $ = $ 9 6" Granular Subbase for ACC (Salvaged gravel, seal coat, and new material) 6,228 SY * $ = $ 10 4" PCC Sidewalk 8 SY * $ = $ 11 6" Granular Subbase for Sidewalk 8 SY * $ = $ 12 6" PCC Host Pad Pavement 122 SY * $ = $ 13 6" Granular Subbase for PCC Host Pad 122 SY * $ = $ 14 Triaxial Geogrid 6,228 SY * $ = $ 15 Grading - On-Site Topsoil - Strip, Stockpile & Respread (6" Respread Thickness) 4,960 CY * $ = $ 16 Grading - On-Site Cut to Fill 1,100 CY * $ = $ 17 Grading - Class 10 Import 200 CY * $ = $ 18 1 1/2" LP Line 95 LF * $ = $ 19 PVC Sch. 80, 1" (Fittings and Appurtenances Incidental) 63 LF * $ = $ 20 PVC Sch. 80, 2" (Fittings and Appurtenances Incidental) 440 LF * $ = $ 21 PVC C900, 4" (Fittings and Appurtenances Incidental) 451 LF * $ = $