Specifications include, but are not limited to: Replacement of the rubber flooring system (including entry ramps at doorways) in the existing Weight Room and any required demolition of damaged concrete subbase below. Modification/addition of the HVAC system in the Boys and Girls Team rooms in Wing E2. Installation of exterior roof curb mounted fencing/screening above the existing bleachers at the either side of the Stadium Press box. Installation of an electrical and dust collection system at the CTE space. A 3-D printer cabinet and adjacent concrete paving at an existing planter in the A wing. Completion of exterior door monitoring equipment from the original project from 2020, modifications to existing security camera mountings, feeds and locations, and the installation of a full height p-lam pilaster in the North stairwell.