Specifications include, but are not limited to: The Contractor shall be able to perform the following typical tasks as assigned by AWWU: A. Walk down the proposed scaffolding scope of work with the facility Superintendent or designee. Advise the Facility Superintendents on the most feasible way to comply with all local, state, and federal rules for scaffold installation. B. Quote the erection, daily rental, inspection, and dismantling of the requested scaffolding. C. Coordinate all erection, inspection, and dismantling of the scaffolding with the facility Superintendent or his designee, then erect, inspect, and dismantle scaffolding as needed (using contractor supplied equipment and personnel) as listed in this request for quotation. D. Record all necessary documentation as required for certification of scaffolding installed at AWWU sites by following the OEM recommendations, industry standards and OSHA regulations. E. Provide all written documentation as required for each scaffolding installation. F. Provide training for qualified user inspection as requested/required.