Specifications include, but are not limited to: Provide construction services for the 4th & 5th Floor Inpatient Unit Improvement Project. Complete the work as more fully described in the attached Construction Drawings with specifications. The new small nurse stations at each Floor Wing are a requirement to be constructed and operational for the nursing staff to relocate temporarily prior to the large nurse stations demolition. The 4th and 5th Floor same Wing can be done concurrently for the Base Bid, Add Alt #2, and Alt #3. The ANMC will give the general contractor two beds at a time for the sequencing the scope of work for the duration of the project. The two beds are defined as: (2) single rooms or (1) double room occupancy. The 4th and 5th Floor Inpatient Room upgrades can be concurrently when in each associated room: Add Alt #1, Add Alt #4, and Add Alt. #5; The new design will incorporate a ‘base bid’ and 5 additive alternates: Base Bid: Remodel of the main hallways, nurse's stations and 8 nurse pods; Add Alt #1: New anti-room finishes (associated with Inpatient Room area); Add Alt #2: New utility room finishes; Add Alt #3: Staff room finishes; Add Alt #4: Inpatient bed lift installations (associated with Inpatient Room area); Add Alt #5: Inpatient room finishes (associated with Inpatient Room area)