Specifications include, but are not limited to: Work of the Project includes demolition of the following: existing water storage tank (WST), wooden tank platform, wooden tank valve box and associated appurtenances, WST fill/draw arctic pipe and supports. The Contractor shall provide a temporary water system including temporary tanks and pipelines to maintain service to the washeteria. The following components shall be constructed: new steel WST platform, new bolted, insulated steel WST (approximately 97,000 gallon capacity/80,000 gallon useable), and new arctic pipe fill and draw pipelines. The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all Work required by these Specifications and as shown on the Drawings and shall have experience with Water Storage Tank construction