Specifications include, but are not limited to: Medford Irrigation District desires to build and operate a floating photovoltaic power generation system on a re-regulation pond at its office location in Central Point, Oregon. • The system should maximize DC output not to exceed 852 kw AC in size. • The project is registered through the Oregon Community Solar Program with Bonneville Environmental Foundation (BEF) as the registered Project Manager (PM). • The project is located in Pacific Power utility service territory, and the PV system will be grid intertied into an existing kva distribution line that runs along the edge of the property. • Pacific Power has completed an interconnection study for the project. The results of the study are included in Exhibit X.