Specifications include, but are not limited to: Benton County expects the selected Consultant to perform requested engineering services necessary for the design of single span small bridge replacements. The specific engineering services to be performed by the Consultant are outlined below: • Right-of-way Services: Right of way services include determining if additional right of way (ROW) will need to be acquired as a part of the project. If ROW is necessary, the Consultant will prepare a map and description of the needed ROW. Also, the Consultant will prepare an appraisal for the potential acquisition with an independent review as required. All work will be in compliance with the Uniform Relocation Assistance and Real Property Acquisition Act. County staff will make necessary steps to contact the property owner and negotiate acquisition of the ROW. • Environmental Documentation and Permits: The following permits are anticipated for each project, but may not be a final and complete list: o Joint Permit Application ▪ Army Corps Nationwide Permit ▪ DEQ Water Quality Certification ▪ Department of State Lands Removal/Fill Permit o Wetland delineation and mitigation (if required) as a part of the removal/fill permit o Oregon Department of Fisheries and Wildlife Road Stream Crossing Permit o 1200CA-Erosion and Sediment Control Documentation as required by the Oregon Department of Environmental Quality • Roadway Design: Roadway design is required to ensure horizontal and vertical alignments facilitate proper roadway transition and drainage. Required cross section information includes roadway widths, material depths and material specifications. Guardrail transitions and terminals shall be detailed to show type and length. A storm water plan must be provided in conjunction with the design of treatment structures. All design work and resulting engineering drawings shall be completed in accordance with the most current version of the ODOT Highway Design Manual...