Specifications include, but are not limited to: 53 In general, Project work includes replacing approximately 21,000 SF of a built-up roofing system with a 54 fully adhered Ethylene Propylene Diene Monomer (EPDM) roof system, including all flashings and metal 55 roof edges. The existing roof systems, flashing, and associated materials will be removed and properly A-2 1 inspected to ensure it is clean and free of defects and new insulation with an average R-value equal to 25.2 2 will be installed. The roof systems will be tapered to drain areas as needed. The vapor retarder will be 3 inspected during construction and if necessary, replaced. The skylight assemblies and curbs will be 4 removed and replaced with new insulated curbs and more thermally efficient skylight glazing assemblies. 5 Staging areas will be strictly defined and coordinated with campus to ensure pedestrian safety and 6 underground utilities are protected as roof replacement proceeds.