Specifications include, but are not limited to: 1. The City will arrange for the disconnection of utility service connections. Before starting demolition, the contractor must verify that all utilities have been disconnected. The contractor is responsible for calling dig safe to get locates. 2. The sewer must be capped. This was done when the house was demolished. The contractor will need to confirm that the mobile home is not connected during the removal. 3. Demolish and remove the mobile home. 4. All demolition materials must be dumped in a demolition landfill licensed by Kansas Department of Health and Environment. 5. Demolition landfill receipts to show landfill usage is required prior to payment for services rendered. 6. Remove concrete, bricks, trash bags, cardboard boxes, furniture, tables, broken plastic, food items, empty food containers, scrap metal, paper, clothing, plastic containers, buckets, limbs, branches and wood on ground, loose trash, debris and rubbish located around the mobile home area. 7. All trees, branches and limbs on the ground, incidental to the demolition of the structures. Trees can only be removed if affecting the demolition of the structure. (Include any tree removal necessary with the bid of the structure) **NOTE if a tree in the City ROW needs to be removed the contractor is responsible for contacting the Code Inspector prior to the removal of the tree. 8. All grass/vegetation must be cut back below the 12 inches to comply with the City of Topeka ordinance. 9. The foundation hole must be inspected to insure no demolition debris is in it prior to back filing of the excavation. 10. The site must be graded to drain away any standing water or drainage way and the ground must be grass seed ready