Specifications include, but are not limited to: The Contractor shall operate, maintain, and manage the System in a cost effective and efficient manner. The Contractor shall operate in compliance with State and Federal permits and rules, which includes required reporting to authorities having jurisdiction, providing adequate maintenance, consider innovations to lower the capital and operating costs of all aspects of operations, and utilize local purchases of supplies, consumables, and services. The System shall include the existing South Water Tower elevated water storage tank and the following infrastructure of the WWTP that is currently under construction. 1. Water Treatment Plant (WTP) (SSOE Project No. 012-02080-21) 2. Water Wells (SSOE Project No. 012-02080-21) 3. North Water Tower (SSOE Project No. 012-02081-21) 4. Site Piping Water (SSOE Project No. 012-02080-21) 5. Wastewater Treatment Plant and Disposal The WWTP (SSOE Project No. 012-02080-16) 6. Force Main and Pump Station (SSOE Project No. 012-02080-16) 7. Emergency Effluent Lagoon (SSOE Project No. 012-02080-21)