Specifications include, but are not limited to: • Task 1 Supplemental Survey: this task may include but is not limited to supplemental ground survey to augment survey completed during the concept design phase; the concept design survey files will be provided to the Design Professional following NTP; this survey was completed to facilitate a quality concept design but may not be all inclusive for final design; Design Professional may be required to perform additional survey. • Task 2 Right-of-Way Engineering: this task may include but is not limited to preparation of drawings and legal instruments required to acquire permanent and temporary construction easements for the project; it is assumed that at least one construction easement will be required; Design Professional may be required to prepare drawings, legal descriptions, perform appraisals, and assist in negotiations for any required rightof-way for the project. • Task 3 Utility Coordination: this task may include but is not limited to coordinating with utilities in the project corridor as well as designing any relocations for utilities owned by PCMC. • Task 4 Final Design: this task may include but is not limited to all civil design tasks required to advance the concept design to a construction-ready design including plans, specifications, and estimates; this task may include design of the Facility, required modifications to roadway elements, intersection treatments, sidewalk and pedestrian ramp adjustments, landscape and irrigation adjustments, traffic control, grading, and erosion control; this task may include environmental permitting and clearance; this task should result in the ability for the construction contractor to complete the construction with minimal field changes or change orders. • Task 5 Advertising Package: this task may include but is not limited to the preparation of all documents required to advertise the project for construction including but not limited to a bid schedule, specifications, and drawings; during the advertising period, the Design Professional may be required to answer Requests For Information (RFIs) relating to the project from bidders; following the advertisement, the Design Professional may be required to review the bids for compliance. • Task 6 Design Support During Construction: this task may include but is not limited to reviewing project submittal, answering RFIs, evaluating field design changes, and preparing formal design changes.