Specifications include, but are not limited to: The project would provide Power Five NCAA sports facility Electrical power and Broadcast cabling and equipment infrastructure improvements at Pauley Pavilion (Basketball, Volleyball, and Gymnastics), Jackie Robinson Stadium (Baseball), Annenberg Stadium (Soccer), and Easton Stadium (Softball) to support UCLA’s joining the Big Ten Conference and produce multiple simultaneous live broadcasts of UCLA Athletic competitions for the Big Ten Network’s B1G+ digital platform. At each of the four (4) sports existing facilities, the project would install and support required upgrades of the existing broadcast communication cabling, camera stations, junction box event panels, television reception panels. Existing conduit infrastructure will also be utilized at each facility to run the new broadcast cabling. A mobile broadcast studio unit with broadcast equipment, provided by the University, will tie into each facility's power and distribute the signals and feeds to the existing campus fiber optics network to be able to distribute back to the Big Ten Network’s main studio in Chicago for distribution. At each existing facility, the project will provide power connections for each camera location and junction box event panels, and television reception panels from an existing electrical substation. Electrical conduit infrastructure and trenching will be provided to support the new broadcast communications cabling and provide power distribution infrastructure within each facility. Existing conduit infrastructure will also be utilized at each facility to run the new broadcast cabling.