Specifications include, but are not limited to: The WSMP will deliver the following elements: 1. Projection of current and future water needs, based on current and projected land use within the urban growth boundary (UGB) o The WSMP team will need to coordinate with the Big Creek Dam (BCD) project team to ensure projections align between both projects and are used consistently throughout the City. 2. Adequacy of hydrologic water supplies to meet current and future water demands, 3. Adequacy of raw water delivery and potable water treatment, 4. Adequacy of finished water delivery and storage systems to meet current, 5 yr, 10yr, and buildout needs. 5. Adequacy of current and future delivery systems to meet fire suppression, fire flow storage, and emergency storage requirements o Fully describe system o Maps of deficiencies and recommended improvements. 6. Capital projects needed to deliver projected immediate, 5 yr, 10 yr, and buildout water needs 7. Infrastructure age and replacement schedule and costs 8. Considerations for resiliency in the event of a major earthquake 9. Computer modelling o Evaluate existing mapping (GIS) for accuracy and completeness o Add/correct components of GIS maps to ensure complete framework for modeling o Model Calibration o Training and/or modeling support