Specifications include, but are not limited to: Hager Hill Campus, Hager Hill, Ky; Work includes the removal of approximately 16,906 SF of existing ballasted single-ply membrane roofing and insulation down to existing metal roof deck and all associated existing metal coping, gutters, downspouts, flashing etc. and replacement with a new modified bitumen roofing system over rigid insulation with new gutters, downspouts, copings, etc. Work includes a new exterior caged wall ladder and new ships ladder to existing roof hatch. Mayo Campus, Paintsville, Ky; Building E: Work includes the removal of approximately 13,224 SF of existing modified bitumen roofing and insulation down to existing concrete roof deck and all associated existing metal coping, flashing etc. and replacement with a new modified bitumen roofing system over rigid insulation with new metal roof edge, etc. Building F: Work includes removal of approximately 600 feet of existing deteriorated precast concrete coping and replacement with new prefinished metal coping. Prestonsburg Campus, Prestonsburg, KY; Student Services Center: Work includes the removal of approximately 18,759 SF of existing modified bitumen roofing and cover board, coping, flashing, etc. and replacement of small portions of wet insulation. Installation of a new modified bitumen roofing system, cover board and insulation over existing insulation, new metal coping and flashing. Work also includes removal of existing brick and repair of flashing and reinstallation of brick at wall above lower roof section. Johnson Building: Work includes the removal and replacement of deteriorated fasteners in existing standing seam metal roofing system, repair of roof penetration flashing, replacement of metal hip and expansion joint covers and application of roof coating system at specific locations. Science Building: Work includes the removal of approximately 10,525 SF of existing modified bitumen roofing and cover board, coping, flashing, etc. and replacement of small portions of wet insulation. Installation of a new modified bitumen roofing system, cover board and insulation over existing insulation, new metal coping and flashing. Work also includes removal and replacement of existing sealant in precast wall panel joints. Pikeville Campus, Pikeville, KY; Clayton Little Building: Work includes the removal of approximately 26,810 SF of existing modified bitumen roofing and cover board, coping, flashing, etc. and replacement of small portions of wet insulation. Installation of a new modified bitumen roofing system, cover board and insulation over existing insulation, new metal coping and flashing. Work also includes the removal of approximately 3100 SF of existing modified bitumen roofing and insulation down to existing metal roof deck and all associated existing metal coping, flashing etc. and replacement with a new modified bitumen roofing system over cover board and new rigid insulation with new metal copings, flashing, etc. Work also includes removal of approximately 500 SF of existing metal roofing, insulation and roof deck down to existing framing, removal of associated existing clerestory windows and replacement with new skylight.