Specifications include, but are not limited to: The Town of New Milford, with technical assistance from the Connecticut Department of Transportation (CTDOT) and funding support from the Federal Highway Administration (FHWA), proposes design and construction of three new segments of concrete sidewalk along U.S. Route 7 (Danbury Road) and a new segment of concrete sidewalk along Aspetuck Avenue, in the Town of New Milford, as further described below: Location 1 involves the installation of approximately 4,000 linear feet of new sidewalk along the High School’s U.S. Route 7 frontage, from Candlewood Lake Road South to Sullivan Court. This segment includes a new timber boardwalk over an unnamed stream. Location 2 involves the installation of approximately 130 linear feet of new sidewalk along U.S. Route 7, connecting a sidewalk gap in front of 177 Danbury Road. Location 3 involves the installation of approximately 600 linear feet of new sidewalk connecting the John Pettibone School property to U.S. Route 7 frontage. Location 4 involves the installation of approximately 1,600 linear feet of new sidewalk along the west side of Aspetuck Avenue connecting the existing sidewalk network near the Town Green with the Canterbury School. In total, the project will construct approximately 6,330 linear feet of new five-foot wide ADA compliant concrete sidewalk with associated crosswalks, curb ramps, traffic signal pedestrian equipment modifications, and signage.