Specifications include, but are not limited to: 1. Liquid Chlorine shall be delivered in bulk and 150-pound cylinders as shown in the quantities section of these Specifications. For both bulk and cylinder deliveries, unloading and placing into storage shall be the responsibility of the Seller. Empty cylinder removal shall be the responsibility of the Seller. The unloader shall wear sufficient Personal Protective Equipment (PPE) during the entire unloading process. For safety reasons, a plant operator will be present during connection/disconnection of hoses for bulk filling, and placement of cylinders. 2. Liquid Chlorine shall be shipped in containers that meet U.S. Department of Transportation (US-DOT) specifications, and that are constructed of material that is compatible with the product. Trailers shall be placarded in accordance with US-DOT regulations. 3. Bulk deliveries of Liquid Chlorine provided to the A. B. Jewell and Mohawk WTPs will be offloaded into City-owned storage containers. Any change in the method or loading/unloading of the chemicals into the City-owned storage containers must be approved by the WTP Superintendent or Operations Supervisor prior to the loading/unloading of the chemicals. 4. Deliveries of the 150-pound cylinders shall be a minimum of two cylinders delivered to the Mohawk WTP. Delivery shall be within five working days of receipt of order. 5. All documents, including shipping invoice, certificate of analysis, bill of lading, weigh tickets, delivery confirmation form, and final invoice shall contain the same identical order number unique for each load delivered.