Specifications include, but are not limited to: Solid Waste Collection/Disposal operations shall be conducted in compliance with all applicable laws, rules, regulations, and restrictions imposed by the State of Mississippi. The contractor will take title to the solid waste when it is loaded into the contractor’s truck. Title to solid waste collected hereunder will pass to the disposal facility or, as appropriate, other state approved disposal facility when such solid waste is delivered to the selected disposal site or state approved disposal facility. Title to and liability for any hazardous waste or unacceptable waste will always remain with the generator generating the unacceptable waste. The contractor shall furnish containers and a dump schedule. Containers are to be standard 8 yards and 6 yards with sliding side doors (slants, if available, to be provided upon request), or 4 yards and 2 yards flaps/hoods (4 cubic yards and 2 cubic yards). Additionally, the Contractor shall furnish large roll-off units (20, 30, 40 cubic yards) to contain rubbish and construction waste. After dumping, each container shall be sprayed with deodorizer of sufficient strength to control container odors.