Specifications include, but are not limited to: The Work includes the construction of a new 3 MG AWWA D110, Type 1, prestressed concrete reservoir; reservoir inlet, outlet, underdrain, drain, overflow, and washdown piping; connections to existing yard piping; temporary piping, electrical, and SCADA connections during construction; landscaping, restoration, and irrigation; electrical, instrumentation, and controls; testing, disinfection, commissioning, and startup. Work includes improvements to the existing tank drain line as well as mechanical improvements to the existing valve vault; excavation, backfill, and earthwork; asphalt access roads and asphalt restoration associated with the construction of new facilities; and all other work required to complete this project as defined in the drawings and specifications.