Specifications include, but are not limited to: 1.Demolition of existing piping/ductwork where it impedes with installation of new. 2.Design of three (3) new energy recovery units including ductwork, chilled water piping, hot water piping, and controls. 3.Design of new chilled water/hot water air handling unit for the Auditorium. 4.Design of freeze protection pumps. 5.Provisions for phasing. The project will be occupied during construction. 6.Design of roof curbs 7.Development of front end documents for bidding (single prime contract) 8.Design of structural supports/modifications. 9.New ceilings and grid. 10.New variable speed chilled water/hot water pumps. 11.New LED lighting 12.Agency approvals for bidding (ex, fire marshal, state agencies). Contractor will obtain building permits.