Specifications include, but are not limited to: I-5: Halsey to Lane County Line Section of the Pacific Highway (Rt. No. I-5) in Harrisburg. FAP No. S001(550). ($ 20,000,000 - $ 30,000,000). Req. approx. 3,975 ft2 temp sign; 24 ea PCMS; 4 ea rdr spd trailer; 187 hr flag; 8 ea flag sta light; 173 ea TCS; 155 hr pilot car; 306,760 ft temp stripe; 2 ea work zone presence light sys; 155 day smart work zone sys; 1,550 yd2 plastic sheet; 1,500 yd2 comp ero blanket; 81 ea inlet protect; 600 ft sed barr; 10 ea straw bale; 18 ton contam soil disp; const surv work; 890 yd2 rem surface; 2,500 ft asph saw cut; 220 yd3 gen exc; temp access/containment; 1,018 yd2 br deck CPPR; 883 yd2 br appr slab CPPR, 85 yd2 CL 2 prep; 1,018 yd2 bond memb rem; 1,260 ft rectglr tube retrofit; 9,155 ft2 poly memb; 1,248 yd2 MPCO; 88 ft elasto conc nose; 174 ft exp joint; 5 ea br id marker; 484,200 yd2 CPPR; 858 ton aggr shoulder; 90 ton fog coat; 200 ton tack coat; 108,000 ton ACP (744 ton PG64-22, 5,736 ton PG70-22ER); 5 ea core corr; 6,000 yd2 ACP rep; 22,872 ft gr rl; 1,350 ft conc barr; 1,350 ft secure barr; 3,369 ea recess pvmt marker; 49 mi rumb strip; 331,900 ft pvmt marking durable; 9,427 lb sign supp; 4,380 ft2 sign; auto traff recorder; 0.5 acre perm seed. Completion Time: September 15, 2025. Class of Work: Asphalt Concrete Paving and Oiling.