Specifications include, but are not limited to: 200 LEAD SERVICE LINE REPLACEMENTS PRIOR TO PAVING; the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Temporary and permanent restoration requirements will be at the discretion of MWW. The contractor will be required to complete a minimum of 1 service per working day.