Specifications include, but are not limited to: Remove the two old UPS units and battery cabinets. Install a wraparound maintenance bypass if one is not already there or built into the new UPS. Install a new UPS that fits the below description. Install the alarm to the existing dial out phone line. This work will need to be done in a manner that minimizes risk to our fish. If the utility power needs to be out, we will need to run the generator and provide a bypass to the UV system. The UPS should include modular N+1 redundant power and battery modules, with at least 6 minutes of battery backup run time at full load. The generator should also be equipped with dual, redundant starter batteries and an automatic best battery selector. The UPS unit needs to be: 100 – 140 kVA Modular power and battery backup Redundant N+1 power and battery modules for 6 minutes at full load rating 480 VAC in, 480 VAC out, 3 phase Non-proprietary software 3rd party serviceable Batteries and components must be readily available. Factory field service must be available for on-site startup and certification.