Specifications include, but are not limited to: Oldham County Fiscal Court is accepting bids for construction of a detention basin and approximately 550 linear feet of planned stormwater conveyance system along the northwest side of the Buckner Soccer Field Complex, which lies adjacent to the Grand Villa Subdivision in Buckner, Kentucky. Mobilization/Demobilization 1 LS; Clearing & Grubbing 1 LS; Common Excavation 2,895 CY (Mass Grading - Gill 979 CY; Mass Grading - Waste 1,196 CY); ; 24" Storm Sewer Pipe 150 LF; Flat Headwall (4/C001) 3 Ea. Rock Lined Flat Bottom Ditch (2/C001) 180 LF; Pond Outlet Structure (1/C001) 1 Ea. Emergency Spillway (Class III Rip Rap) (3/C001) 1 Ea. Rock Outlet Protection (4/C701) 2 Ea. Concrete Low-Flow Channel 125 LF