Specifications include, but are not limited to: Upgrade and capacity expansion of the existing influent and transfer pump stations, installation of a new 1.0 MG equalization basin with associated aeration system, construction of a new 0.500 MGD aeration basin utilizing a jet aeration system, construction of two 45ft. diameter center-feed secondary clarifiers, construction of a new returned activated sludge pump station, construction of a new effluent structure consisting of chlorination, de-chlorination, post aeration, non-potable water supply system, flow monitoring and sampling, installation of associated site and grading work, site piping and other utility improvements, construction of various concrete structures for flow diversion and control, installation of an expanded and upgraded electrical / instrumentation / SCADA networks, installation of a new emergency generator set, construction of a maintenance building addition, maintenance and material replacement of an existing sewer pump station, abandonment of several existing WWTP structures, relocation of existing process equipment, and other associated work all as needed to upgrade and expand the existing WWTP from a capacity of 1.0 MGD to 1.5 MGD