Specifications include, but are not limited to: 1. Design Exterior Upgrades/Repairs for Non-Potable Booster Station a. Size and relocate transformer. b. Install new primary power feed from pole to transformer. c. Install new meter, power panel, and disconnect. d. Install new secondary power from transformer into booster station disconnect (480V). e. Design new lightning protection for booster station building. f. Add exterior LED lighting at both entrances and on the north side of the building; lights must shine down. g. Replace rain gutters and down spouts. 2. Design Interior Upgrades/Repairs for Non-Potable Booster Station a. Install new chlorination system needed to chlorinate the effluent water from Los Alamos Wastewater Treatment Plant. The design shall include all necessary controls, metering, chemical feed equipment, solution piping, and control wiring. The system shall be a Miox system with dosing pumps for 700 gpm; design for 1000 gpm. (A factory test on the chlorination system and chlorination injection system to operate as one unit will be required.) b. Install new at HMI SCADA system; the new SCADA system shall include an Allen Bradley 5000 series controller to fiber node. c. The new chlorination system shall be incorporated into the new SCADA system. d. Install new Benshaw Motor Control Center (MCC) cabinet with 2 HOA switches and controls. e. Install new 208/120 v panel (200 Amp or sized to fit all loads). f. Install new leads to motors from MCC’s accordingly. g. Install new circuits for Miox generator and dosing pumps. Station circuits to include lighting, fans/louvers, heating, and outlets. h. Analyze HVAC for chlorine gases. i. Install new discharge isolation valve. j. Replace 2 new exterior pump isolation valves upstream of pumps. k. Replace interior gate valves and check valves downstream of the pumps. l. Reuse electrical conduits, if possible. Remove rigid conduits that are not in use. m. Brine and chlorine tanks will be reused. n. Paint the building interior and repair walls as needed. o. Install new double door and frame. p. Evaluation of miscellaneous building features to be determined and scoped by Engineer. q. Evaluate surge protection needs.