Specifications include, but are not limited to: (Greenmeadow Lane, Eastway Parking Lane, Euston Street, Sterling Court & Various Locations) \ 60 LF - 12” Storm Sewer \ 68 LF - 4” PVC C900 DR 18 Perforated Underdrain \ 380 LF - 4” PVC SDR 26 Perforated Underdrain \ 85 LF - 6” PVC SDR 26 Perforated Draintile \ 2 EA - Storm Structure Adjustment \ 3 EA - Storm Structure Rehabilitation \ 3 EA - Sanitary Manhole Adjustment \ 2 EA - Sanitary Manhole Rehabilitation \ 318 SY - Geotextile HDPE Impermeable Liner (60 mils) \ 6,500 SY - Milling Pavement \ 1,600 LF - Pavement Sawing \ 2,300 SF - Remove Concrete Walk \ 5,100 SF - Remove Concrete Driveway \ 2,800 LF - Remove Concrete Curb & Gutter \ 340 LF - Remove Concrete Curb & Gutter Head \ 2,230 SF - 5” Concrete Walk \ 5,100 SF - 7” Concrete Driveway \ 2,430 LF - 24” Mountable Concrete Curb & Gutter \ 840 LF - 31” Concrete Curb & Gutter \ 100 SF - Yellow, Curb Ramp, Detectable Warning Field \ 200 SY - Permeable Pavers (3 1/8” Thick) \ 1,975 CY - Excavation \ 2,250 TON - 1 1/4" Crushed Aggregate Base \ 980 TON - Breaker Run \ 720 TON - HMA Pavement (3 LT 58-28 S) \ 270 TON - HMA Pavement Leveling Course (5 LT 58-28 S) \ 790 TON - HMA Pavement (5 LT 58-28 S) \ 1,100 SY - Sod \ ALTERNATE A – (Foxley Court) \ 1,070 SY - Milling Pavement \ 100 LF - Pavement Sawing \ 470 SF - Remove Concrete Driveway \ 205 LF - Remove Concrete Curb & Gutter \ 470 SF - 7” Concrete Driveway \ 145 CY - Excavation \ 150 TON - 1 1/4" Crushed Aggregate Base \ 110 TON - Breaker Run \ 70 TON - HMA Pavement (3 LT 58-28 S) \ 130 TON - HMA Pavement (5 LT 58-28 S) \ 195 SY - Sod Restoration \ ALTERNATE B (Forest Court) \ 580 SY - Milling Pavement \ 100 LF - Pavement Sawing \ 520 SF - Remove Concrete Driveway \ 30 LF - Remove Concrete Curb & Gutter \ 520 SF - 7” Concrete Driveway \ 50 LF - 24” Mountable Curb & Gutter \ 70 CY - Excavation \ 80 TON - 1 1/4" Crushed Aggregate Base \ 60 TON - Breaker Run \ 30 TON - HMA Pavement (3 LT 58-28 S) \ 70 TON - HMA Pavement (5 LT 58-28 S) \ 90 SY - Sod Restoration