Specifications include, but are not limited to: Contractor shall provide all labor, materials, tools, and equipment necessary to remove existing dry wall and molding, and replace with new drywall and molding, paint new drywall, as well as install new carpet. Requirements: Remove all furniture, file cabinets, desks, computer workstations, bookshelves, and all items requiring movement to facilitate installation of carpet. Jesse Thompson will designate areas for items to be stored if needed. Exchange Building - Building 119 Contactor shall remove approximately 64 square feet of existing damaged drywall. Contractor shall remove approximately 177 linear feet of existing 4 inch cove base molding. Contractor shall hang, tape, and float approximately 64 square feet of 5/8 inch dry wall to replace the removed drywall. The new drywall texture shall match the existing texture. Contractor shall paint approximately 1,561 square feet of walls with two coats of Sherwin-Williams Super Paint interior acrylic latex paint with eggshell finish, or equal. The color of the paint shall be Sherwin-Williams 6017 intuitive, or equal.