Specifications include, but are not limited to: The work to be performed under this contract for Water Treatment Plant No. 1 Improvements shall consist of furnishing all labor, equipment, and materials (unless specifically called out in this solicitation) necessary to rehab or construct as per the specifications. This includes the following major components: Repair of Sedimentation Basin #1, 2, and 3 walls (concrete, stucco, crack, leaks and voids) Disinfection Enlarging openings at rapid mix and flocculation for Sedimentation Basins #1, 2, and 3 Replace both filter building valves, Clearwater Pump Systems, and Piping Improvements Backwash Supply Pump Station Rehab Electrical Rehab East Filter Underdrain and Media Replacement.