Specifications include, but are not limited to: A. Project Coordination – In accordance with specifications & Contract Documents a. Construction Schedule i. Provide baseline construction schedule capturing all required scope of work b. Schedule of Values i. Provide SOV that is of equal level of granularity as construction schedule c. Submittals i. Prior to commencement of construction, the contractor shall submit product data, where appropriate, for review and approval. B. Update Path of Travel as required to comply along path as shown within scope a. Perform Work as outlined in plans, specifications and contract documents i. See sheets: G-003, G-004, G-005, G-006 & G-007 C. Demolition (ASD101) a. Parking Lot A i. Remove Existing Accessible Striping and Symbols ii. Remove Existing Curb and Landscape Between Parking Stalls. Prep for New Curb (G-003) b. Parking Lot B/North i. Remove Existing Graphics and Stripes. Prep for New Stripes (G-004) ii. Remove Existing Truncated Domes, Replace with Concrete. Align with Existing Adjacent Concrete D. Accessibility Site Plan(s) a. Parking Lot A i. Install One Accessible Parking Sign per sign of Existing Posts (8/G-003) ii. New Curb (6/G-003) iii. Accessible Parking Striping and Markings (2/G-006) iv. Accessible Parking Symbol (2/G-003) v. New Drop-Off & Loading Sign onto Existing Signpost (4/G-003) vi. Truncated Domes (4/G-006) b. Parking Lot B/North i. Replace Existing Tow Away Sign (2/G-006) ii. Truncated Domes at Zero Curbs (4/G-006) iii. Truncated Domes (4/G-006) iv. Re-stripe Existing Accessible Parking (8/G-006) v. Provide 36” Detectable Warning Surface Along Sidewalk (4/G-006) c. Existing Staff (MEN’s) Restroom A#04-110326 (20/G-006) 1. Ambulatory Stall (6/G-006) a. Provide (2) Grab Bars to Match Existing b. Reverse Door Partition to Swing Out 2. Relocate (1) Flush to 1½” Min Below Grab Bar (21/G-006) 3. Relocate (1) Hand Dryer d. Existing Staff (WOMEN’s) Restroom A#04-110326 (20/G-006) 1. Relocate (1) Flush to 1½” Min Below Grab Bar (21/G-006) 2. Relocate Sanitary Napkin Disposal (3/G-006) 3. Relocate (1) Hand Dryer e. Existing High School Unisex Student Restrooms A#04-110326 (1/G-007) 1. Relocate (1) Flush to 1½” Min Below Grab Bar in EACH Restroom (3/G007) 2. Provide Unisex Signage for BOTH (9/G-006) 3. Remove Existing Paper Towel Dispenser, Replace with Bobrick B-262 Paper Towel Dispenser. (BOTH RESTROOMS) (1/G-007) a. 3-15/16” Projection from Wall Mounted at 40” Max to Towel Dispenser Slot