Specifications include, but are not limited to: 1. The work to be performed under this contract consists of furnishing and delivering all labor, materials, supervision, construction equipment, mechanical and electrical equipment not furnished by the St. Tammany Parish Department of Utilities, travel utilities, transportation, supplies, tools and services necessary for performing all work as specified in the Contract Documents, plus whatever work may be added as extra work under the provisions stated elsewhere in these documents. 2. The intent of the work is to: a) Protect and maintain in service all utilities affected by the construction work. The Contractor shall note that existing underground utilities, in addition to water and sewer lines, may include direct buried conductors and cables, the exact location of which are unknown. It shall be the Contractor’s responsibility to locate such utilities prior to excavating and to protect them during excavation and construction. b) Clearing, grubbing, demolition, removal, excavation, filling, and grading required to construct the project and to restore affected areas to their original condition or as indicated on the Contract Drawings. c) Work at Well Site No. 1: i) Furnish and install new pumping unit. ii) Improvements to chemical injection. iii) Construct an 8’x8’x8’ height concrete masonry unit building with metal roof. iv) Furnish and install a flow meter. v) Modifications to the well head and associated piping. vi) Hypochlorite storage bulk and day tanks. vii)Duplex Hypochlorite pump skid, complete with associated piping and control panel. viii) Furnish and install an emergency shower/eye wash station. ix) Furnish and install new facility control panel. d) Work at Well Site No. 2: i) Improvements to chemical injection. ii) Construct an 8’x8’x8’ height concrete masonry unit building with metal roof. iii) Hypochlorite storage bulk and day tanks. iv) Duplex Hypochlorite pump skid, complete with associated piping and control panel. v) Furnish and install an emergency shower/eye wash station. vi) Relocate existing facility Control Panel to the location indicated on the Drawings.