Specifications include, but are not limited to: Cement Bulkhead (existing) - A 10’X6’ poured concrete bulkhead was installed spring 2022 as part of the River Walk Park project. Bulkhead was permitted by DEP through Wright Ryan. Headworks - will be built from #2 SYP pressure treated lumber and attached to the cement bulkhead. It will be handicap accessible and have a lockable gate. Aluminum gangway - will be 30’ long and 3.5’ wide It will attach to the headworks with hooks and D rings. The lower end of the gangway will have rollers and land on top of the first float section of the dock system. Floats - ten 24’X10’ float sections constructed from #2 severe service SYP pressure treated lumber with galvanized corner brackets, through bolted to internal galvanized gussets. Frame will be 4”x8” with 2”x10” skirt boards and 2”x6” decking. A raised 2”x4” rail suitable for attaching vessel dock lines will be on the 24’ sides of each float and the 10’ ends of the three end floats. Floatation will be drums providing a minimum of 5,000 pounds of reserve buoyancy pre float and approximately 18” of unloaded freeboard. Three floats will be used perpendicular to the riverbank to gain adequate distance out into the river. The remaining seven float sections will run parallel to the riverbank providing 170’ of parallel berths. Connectors and Hardware- All connections, mooring attachments, fasteners and hardware will be galvanized steel or stainless steel.