Specifications include, but are not limited to:Contractor will be responsible for duties that include, but are not limited to the following: 10.1 Production and installation of exterior, cut-vinyl graphics on eight 27-foot cutaway paratransit buses. a. Tentative sizes and approximate layout of decals shown in ATTACHMENT A. b. Specific locations of decals and overall layout may be altered slightly to accommodate changes to buses from previous builds. 10.2 Production and installation of interior, cut-vinyl graphics and signs on the same eight buses. a. See ATTACHMENT B: METRO BUS INTERIOR SIGNS. b. Specific locations of decals to be determined with first installation. 10.3 Measurement of buses a. A pre-production meeting at Metro Bus Operations Center, 665 Franklin Avenue, NE, St. Cloud, MN 56304 is required when the first bus becomes available. b. Sizes and locations of decals may vary slightly based on measurements taken during the pre-production meeting. c. A specific timeframe for decal production and scheduling of graphics installation on the first bus must be included as part of your proposal.