Specifications include, but are not limited to: Lovington Airport – Zip Franklin Memorial • Install AWOS • Install Apron pavement rehab (all areas) • Install Taxiway Preservation (all taxiways) • Install Additional Tie-Downs • Crack Seal, Seal Coat, and Stripe Taxiways and Ramp Areas • Fencing Improvements • Relocate RW 3/21 and install Taxiway w/L.E.D.'s • RW 3/21 MIRI- Replacement w/L.E.D.'s • Pavement Markings and Signage • Airfield Striping and Pavement Markings • Acquire Property Interest of R.P.Z.s on Three Runway Ends (25 total acres) • Runway 12/30 Hold Aprons (Run-Up Area) • Prepare the D.B.E. program and goals • Prepare and update SWPPP • Airport Masterplan Update • Expand the Vehicle Parking Area • REILs on 3/21 and 12/30 • RW 12/30 MIRI- Replacement w/L.E.D.'s • Grade RSA, ROFA, ROFZ on RW 3 • Redevelop Existing Fuel Island • Miscellaneous Services as needed • Grants Administration • Remove and relocate hangars • Update R.W. designations Hobbs Airport (H.O.B.) • Electrical Vault improvement(s) and miscellaneous electrical updates • Rehabilitate Pavement or Seal Coat Ramp Areas • Rehabilitate Taxiway Lighting - PH I (A, B, C) • Rehabilitate NW Ramp (39,000 SY) • Rehabilitate NE Ramp (44,000 SY) • Airport Layout Plan • Safety Area Improvements – Northeast end of RW 3/21 (RW 4/22) • Acquire Property Interests for RW 3/21 (RW 4/22) Extension • Install ARFF and Terminal Emergency Generator • Relocate MALSR, Glideslope and Install PAPI-4 on RW 3 (RW/4) • Rehabilitate Runway 3/21 (RW 4/22) • Extend Taxiway A from Taxiway A to Taxiway D • Safety Management Systems coordination • G.I.S. - Electronic A.L.P. • Terminal building expansion (Phase 4) • Prepare the D.B.E. program and goals • Prepare and update SWPPP