Specifications include, but are not limited to: Contracting services for the removal of existing cooling tower, and installation of (1) new in kind cooling tower, associated piping, and catwalks. 1. Obtain all applicable and trade permits needed from state agencies (RIBCC, etc.) 2. Demolition and removal of the old cooling tower and piping to roof penetration. 3. provide a new all stainless-steel Baltimore Aircoil cooling tower including catwalk with ladder, and piping. See attached BAC product data & shop drawings. 4. Include all Electrical power, Siemens control wiring, water treatment system, plumbing, and insulation scope. 5. Provide crane, crew, rigging, and safety measures to properly off-load and install roof-top equipment. 6. Include all associated material, start-up, commissioning, 1-year warranty, and as-built documents. Electronic and hard-copies. 7. If water treatment equipment needs to be replaced this will be done as a unit cost listed below. 8. If a Variable Frequency Drive (VFD) is needed, this will be done as a unit cost listed below. 9. This work will be performed during normal (7:00am to 3:30pm) business hours.