Specifications include, but are not limited to: PRINCIPAL ITEMS OF WORK AR APPROXIMATELY AS FOLLOWS - ROADWAY - MOBILIZATION 1.000 LS; CLEARING AND GRUBBING 1.000 LS; REMOVAL OF BRIDGE (STA. 11+00) 1.000 UN; REMOVAL OF PIPE (ALL SIZES) 30.000 LF; UNCLASSIFIED EXCAVATION (FM) 2,045.000 CY; EXCESS EXCAVATION (FM) 340.000 CY; STRUCTURE EXCAVATION 150.000 CY; GEOTEXTILE FABRIC STABILIZATION (TYPE III) NON-WOVEN,; (AOS <0.43 mm) 525.000 SY; TEMPORARY STREAM DIVERSION 1.000 EA; GRANULAR MATERIAL, (CLASS 4, GROUP “C”) 680.000 TON; CRUSHED STONE (SIZE 57) 355.000 TON; 18” REINFORCED CONCRETE PIPE, CLASS III 40.000 LF; 36” REINFORCED CONCRETE PIPE, CLASS III 40.000 LF; RIGHT-OF-WAY MARKERS (TYPE I) 9.000 EA; MAINTENANCE OF TRAFFIC 1.000 LS; ADDITIONAL CONSTRUCTION SIGNS 0.000 SF; EROSION CONTROL - COMMERCIAL FERTILIZER (13:13:13) 0.950 TON; AMMONIUM NITRATE 0.100 TON; SEEDING 0.950 AC; VEGETATIVE MATERIALS FOR MULCH 2.850 TON; EXCELSIOR BLANKET 250.000 SY; TEMPORARY SILT FENCE (TYPE I) (AOS 0.15 mm – 0.84 mm) 200.000 LF; WATTLES, 20” DIAMETER 160.000 LF; LOOSE RIPRAP, 300 LB. 700.000 TON; GEOTEXTILE UNDER RIPRAP, TYPE V, NON-WOVEN AOS < 0.43 mm) 670.000 SY...