Specifications include, but are not limited to: 1) Roofing - Replace asphalt roofing on buildings 1,2,5 & 6. 2) Doors - Replace metal front & rear entry doors with fiberglass entry doors and new hardware. Replace existing front & rear storm doors with self-storing doors. 3) Windows - Replace existing casement style with double hung in all units and community building. 4) Siding - Replace existing vinyl siding with new, including soffits and aluminum cladding. 5) Gutters - Replace gutters and install leaf screens on all buildings. 6) ADA Compliance - Convert 4 residential units to comply with ADA & UFAS requirements. Improvements to the Community Building for ADA & UFAS compliance. 7) Generators - Refurbish existing Community Building generator. Install new generators to power all residential units. 8) Fire Alarm & Call for Aid – Upgrades/replacement of existing fire alarm and call for aid systems including fire alarm control panel. 9) Electrical upgrades - Replace existing Federal Pacific Electrical panels at all locations. 10) Energy Upgrades - Replace plumbing fixtures with water saving/low flow fixtures. Replace fluorescent lighting in residential units and Community Building with LED fixtures. Replace water supply shit off valves in all units and Community Building.