Specifications include, but are not limited to: The work includes site preparation, demolition of a portion of the existing asphalt pavement and its replacement with a combination of a new concrete slab on grade, new crew parking area, miscellaneous pavement, ADA accessibility improvements and treatment of the existing asphalt surface; an attached structure with decontamination showers and restrooms for training use; an underground water recovery system that reconfigures the existing storm drain system (with pumps), a solar panel system mounted over carports, the site preparation, footing excavation and layout of a structural footing along with the installation of an lighting electrical system for a prefabricated structure (tower pre-fabrication and installation done by others), and deferred solar panel submittals for the Building Department and Fire review, approval, and permits.