Specifications include, but are not limited to: The work involved in WRIGHT COUNTY ADW CLOSURE-WETLAND PROJECT consists generally of 41,728 cubic yards of grading and topsoil placement, 240 linear feet of reinforced concrete pipe, 2,384 linear feet of polyethylene pipe, 80 linear feet of CMP, 765 tons of riprap, 560 tons of crushed gravel, 1,725 linear feet of straw wattles, 84.6 acres of buffer seeding, 2.8 acres of hydro-seeding, along with related subsidiary and incidental work. The total project cost is estimated to be between $500,000 to $650,000. All work and materials are to be in strict compliance with specifications prepared by JEO Consulting Group in Ankeny, Iowa, which, together with the proposed form of contract and are by this reference made a part hereof as though fully set out and incorporated herein.