Specifications include, but are not limited to: construction of one (1) new artificial turf field. This scope of work for the construction project includes, but not limited to, the underground improvements for the new turf fields, excavation of existing soils, grading, underground drainage systems, fill materials, regrading and seeding of spoils on-site, new concrete curb, new flagpole, running domestic water pipes and connections, and installing of electrical conduit and boxes, (2) goal posts, and the installation of (2) supports for game clocks. The Artificial turf field system and its installation will be purchased off the State Term Contract by the District from a third-party. The contractor shall be required to coordinate the contract work with the Turf Field System supplier/installer and any daily school activities.