Specifications include, but are not limited to: Phase One – Preliminary Design 1. Work with the Grant Administrator and the Canton Housing Authority staff to review existing site conditions and determine the extent of the additions, renovations and modification necessary to logically incorporate them, produce and submit preliminary plans and construction cost estimates. 2. Prepare preliminary drawings and specifications for review and comment from the Canton Housing Authority and Connecticut Department of Housing. Prepare changes/revisions as required. 3. Prepare preliminary cost estimates for the proposed upgrades. Phase Two – 90% Drawings, Specifications & Budget for Application Submission 1. Provide 90% drawing, technical specification and final construction budget to Housing Authority for submission to Department of Housing for funding