Specifications include, but are not limited to: Task One Complete water line burial on Tishániik Farm property. Install fencing in identified locations. Build outhouse in identified location.; Task Two Prepare, order, and install items for the spring/summer of 2024, including but not limited to the water station, shelving in storage containers, refrigerated Conex wall and insulation, and gates on storage container structure. Secure Farm Assistants as needed. Begin the planting for the season based off of the following list and seasonality and label rows. Coordinate with Distribution Tech around planting and harvesting coordination.; Task Three Farm Manager will maintain the Tishániik Farm throughout the growing season and continue planting based on seasonality and the growing list provided. Secure Farm Assistants as needed.; Task Four Winterization of the Farm and cool weather planting. Secure the water system for the winter months. Planting cover crops, till, mulch as needed.; Task Five Prepare, order, and install items for the 2025 growing season.