Specifications include, but are not limited to: The Contractor shall provide all supervision, labor, equipment, and materials to install a concrete sidewalk. Sidewalk at the back of the jail approximately 985’ long by 3’ wide. • 4” thick 3000 psi concrete cast on 4” compacted stone base. • Glass Fiber. • Troweled control joints every 5’. • Light broom finish sloped outward from building. • Grade soil along edge upon completion (seeding by other’s). • Sod and soil removed to required depth. • Form and pour concrete. The Contractor shall keep the property and adjacent areas free from accumulations of debris. At the completion of the work, the Contractor shall remove and properly dispose of all work-related debris and digging spoils, leaving the work area clean.